Picture 1 shows sidewalk pavers laid on West Wellington in 2009. The pattern repeats often, with the joint lines lining up in long straight lines. The manufacturer’s instructions caution against this pattern, as the eye sees the long lines.
Almost the same pattern, laid along West Wellington in 2008 contracts. The pattern is very similar to the top picture, but there are no long lines. Every few meters, the blocks jog a bit to break up the distracting line pattern. I find this a much more pleasing pattern.
Does anyone think this matters?