The access road to Lemieux Island water plant has been badly torn up for the construction of the high pressure water mains to the Island. Finally, the road is reappearing, although as you can seeĀ from a careful examination of the photo the new road is relocated to the left. During the construction, the ornate gates — which look like they belong to Her Highness the GG instead of here — were removed and this shows the eastern side gate and pailings reinstalled.