Major changes coming to downtown streets

The current downtown Ottawa is rather blah. Some might even call it bleh. Over the decades, it has become a motor-vehicle-oriented environment, with the fast movement of vehicles the main only priority. We all know about the walls of buses. And the priority given to automobile commuters over pedestrians. Trees: rare as hen’s teeth. It has become a downtown one goes to because you have to. It is not a shopping, or even much of a recreation destination. All rather sad. When the LRT is opened, there will be major changes. Most OC Transpo buses will be off the Albert … Continue reading Major changes coming to downtown streets

Lonely house on the parking lot

The area along the O-Train corridor has undergone lots of changes from its original industrial beginnings. Occasionally, an old building survives. Notice that it has a real slate roof, there are few houses or buildings left in our neighborhood with slate roofs. In this case, it probably was to provide additional fire proofing from the sparks that flew out of the many steam engines in the area. David Jeanes tells me this may have been the home of Ottawa Stair Works. Probably built right after the Great Fire in 1902, the building then faced Somerset Street which was not yet elevated up on the … Continue reading Lonely house on the parking lot

Signs of the times

  The City ascribes geographic omniscience as a characteristic of cyclists. How else could one explain the total lack of street signs or directional signs along the City’s multi-user paths (usually called “bike paths”). In contrast, vehicular motorists are considered by the City to be geographical ignoramuses. How else could one explain the provision of street signs on every corner of every street, no matter how minor the street or how few places (if any) there are on the street? Sarcasm aside, there should be street signs along pedestrian and cycling paths. They should be installed using similar criteria to regular street signs, ie at every … Continue reading Signs of the times

Desire lines in the snow

Pathways through fields tell us a lot about where people want to go. Frequently it is not where the planners or architects’ walkways want to take us. That’s because they usually make walkways accessories to buildings, following the same square lines. In the summer, paved walkways and roads hide the pedestrian record. But in winter, the size of the beaten path tells us how many people want to go somewhere. And if they want to go badly enough they will boldly go where no snow plow has gone before. [cut the Capt’n Kirk stuff –ed]. Let’s start off with the … Continue reading Desire lines in the snow

Is it time for a Sparks Street bike mall ?

Late last year I wrote a two part post for www.SpacingOttawa.ca on the Downtown Moves project, a scheme aimed at improving the downtown pedestrian and cycling environment. This improvement is to make the LRT project work better by improving access to the stations; and to improve the downtown post-LRT implementation when the space currently occupied by bus movements will be much reduced. There were a lot of ideas in those posts, and some are worth elaborating on.   Today, can the Sparks Street mall be improved by making it a bike mall? Downtown pedestrian malls were all the rage a few decades ago. Some are still thriving; many … Continue reading Is it time for a Sparks Street bike mall ?

Bayview Station (final)

The saga of the amazing perambulating Bayview Station is nearing completion. Recall that the station has been proposed in various scales, sizes, and locations. Well, the final plan is available exclusively to readers here. Bayview Station is back to being “on the structure” of the transitway bridge over the O-Train cut (yes, I know, the O-train isn’t in a cut, it’s on the level, it’s the road that is elevated, but  such is our road-focussed society that the road becomes the normal level, and the flat becomes the hole…). The new station is in the same style as the majority of other proposed LRT stations. … Continue reading Bayview Station (final)

Sim-City model: Bayview-carling CDP

The City has been sporadically doing up a CDP (Community Design Plan) (which is a plan of dubious effectiveness under the Official Plan) for the O-Train corridor running from Bayview Station to Carling Avenue. Residents frequently ascribe its tardiness to a desire on the part of the City to see all the developable land purchased and rezoned before the plan is drawn up. In that way, the city won’t have to continually amend it. The City is committed to having CDPs done for all the stations along the OLRT. Having seen some of the in-progress ones I’d have to say they are better than nothing.  At least they … Continue reading Sim-City model: Bayview-carling CDP

Planning the O-Train bike path

Okay, so it’s not really a “bike path”, the City doesn’t have any of those. We have MUPs, or Multi User Paths, which are shared by cyclists, dog walkers, parents with wailers, grannies with yappers, kids alone,  etc. (It makes an interesting contrast: on roads, cyclists are told to play nicely with cars, buses, and tractor-trailers going 70km; off road, cyclists are sent to play with various pedestrian folks). I’m on the PAC (public advisory committee) for the O-Train path that will eventually run from the Ottawa River pathways south to Dow’s Lake. The City will construct the section from Bayview Station to Somerset (or maybe … Continue reading Planning the O-Train bike path

Bike shelter at Bayview Station

OC TRANSPO has installed the new bike shelter at Bayview Station. It does not have a glass wall on the “back” side of it, but nor is the back side readily accessible for cyclists while there is loose dirt/mud. Presumably, if no glass back wall is installed, and the grass grows, some cyclists can use the rack from the back side but at the cost of losing out on the roof. Is it safe to suggest this is another one-sided front-in only bike shelter? In which case, it holds six bikes. After we spend millions on the new Bayview LRT and indoor-transfer-by-escalator to the … Continue reading Bike shelter at Bayview Station

How “secure” (or disruptive…) will the OLRT be?

        We are in the process of replacing the transitway with LRT. In the Scott Street cut, this won’t matter much. But at either end of the cut, it matters a lot. The City is preaching two totally opposed messages on how the track will interact with the community.  On LeBreton Flats, they claim that anyone getting near the tracks will be imminent mortal danger so great that six foot high chain link fences will be constructed on both sides of the tracks. For pedestrian safety, of course. So there will be no crossing of the tracks through the Flats.  City staff … Continue reading How “secure” (or disruptive…) will the OLRT be?

OC Transpo provides better bike parking

Users of the main transitway stations will have noticed that some bike parking racks have been shoved aside from their usual locations. Then concrete pads have been poured. Only at Baseline Station did I notice a sign identifying what is going on: new bike racks. Kudos to OC for providing better bike parking. In the pic below notice the new shelter, the moderately strong bike racks, and in the distance, the numerous bikes attached to the shoved-aside racks that are no longer bolted to the ground (and the background, the free employee parking lot attached our municipal office building). And here is a … Continue reading OC Transpo provides better bike parking

NCC reopens the gate …

Madame Chairman sent crews of workers down to LeBreton Flats and the Preston “extension” on Friday morning. Crews were busy adjusting the tension on the chain link fence, lopping off a few weeds, removing a superannuated  “stop” sign, etc. They even cut off the protruding rebar and its chip-bag safety cone top: While I was watching the crews, there were a steady stream of walkers and cyclists going through the gate. And a trickle of media-types to check up on the path. That the path is reopened is an example of people-power over the bureaucracy. Together, by complaining to Madame … Continue reading NCC reopens the gate …

NCC closes popular cycling link after promising to keep it open

Readers may recall the brief brou-ha-ha in late June and early July, when the gate at the north end of Preston street was unexpectedly closed and locked. You can read about it here: http://westsideaction.wordpress.com/2011/06/28/popular-bike-and-ped-route-locked-shut/#comments (when you get to the link, scroll up a bit to read the post, and down a bit to see the commentary). See also http://www.ottawacitizen.com/Shortcut+river+locked/5038541/story.html To recap, there is a paved bit of ‘closed’ road running north from Preston and Albert to a legal crossing of the transitway and then connections to the Ottawa River pathway network. It is popular with people walking to work, cycling, walking … Continue reading NCC closes popular cycling link after promising to keep it open

Tunnel goes underground

Faithful readers will have seen earlier posts showing the excavation under the Somerset Viaduct, the placing of the new multi-user path underpass precast sections, and most recently, their waterproofing. Here’s what’s been happening lately: This version of the Canadarm pumps cement right to where the workers want it, when cement mixers cannot get close enough. The arm reached right over the hole, and down the outside of the viaduct walls, to pump cement into reinforcing walls on the exterior of the viaduct: Meanwhile, on the inside of the viaduct, workers installed the last of the tunnel waterproofing and drainage pipes, and … Continue reading Tunnel goes underground

Bike repair station

I noticed recently that Ottawa City Hall will be providing some sort of bike repair station at their nifty new bike parking facility. The one shown above is at my son’s university. They were to be found in numerous places around campus. The bike can be lifted up by its seat and inserted into the bent metal pipes to hold the bike up off the pavement so the crank or wheel can be spun. The tools are all attached by a sturdy cable, and are supposed to be placed in the tray behind the red sign but obviously people prefer to let them all … Continue reading Bike repair station

Somerset tunnel: inside view

The new pedestrian-cyclist tunnel under Somerset Street is now complete except for waterproofing and filling in the hole above it. Here are some shots taken from the top edge (Somerset street level) into the hole: The above picture is looking north; the one below is a steeper angle showing the south portion: In pictures on previous posts this week, I showed the holes the run through each tunnel segment. A threaded rod was inserted through the holes, from one end of the tunnel to the other, and then the city tightened a nut at each end, tensioning the pieces together. Here is … Continue reading Somerset tunnel: inside view

More Tunnel Segments go under Somerset Street

A big truck delivers another section of tunnel to Somerset Street. The extra-wide load is escorted by leading vehicles. Each tunnel segment weighs 32 tons. The deliveries are not permitted during morning or evening “rush hours” so as to minimize traffic delays.                                   Continue reading More Tunnel Segments go under Somerset Street

Hidden treasures

I was out a few weeks ago helping to put parking survey slips on parked bikes in the downtown. The focus was on bikes parked on the surface of streets between Wellington and Laurier. There were incredible numbers of bikes around Place de Ville. But there are also some tucked away parking spots, here is one off Wellington: If you squint closely, you might notice two-thirds of the way down the row, on the right, there is even one of those bike maintenance posts to hang your bike one whilst oiling it, adjusting the gears, etc. I didn’t notice a handy-dandy tool kit near-by, though. Continue reading Hidden treasures

How to ride a bike through Thick cement

Recall that the new O-Train corridor cycling path parallels the tracks on their east side. To get under Somerset Street, the City is constructing a new underpass for the multi-user path. The north portal has been cut out; here is the view from the top of the hole in Somerset:  Notice how thick is the base of the wall of the viaduct. There is no further foundation — the wall just bulbs out and rests on the dirt. It reminds me of those blocks sold to hold up decks — rather than digging a deep hole and filling it up with cement, … Continue reading How to ride a bike through Thick cement

Toe chopping specials

Residents of the national capital(e) are indeed fortunate beneficiaries of tax dollars collected from the good folks of Ecum Secum and Lower  Shubenacadie who provide us with wonderful paths and benches to sit on. I am not sure how much thinking goes into the details of bench location, though. Take the above pic, which shows the most typical installation of a bench right on the edge of the travelled portion of the path. Slouch down and you risk getting your toenails clipped by passing cyclists. If you stopped because your kid was squirming in the stroller or bike trailer, and needs to run around for … Continue reading Toe chopping specials

Dullsville

Some days on the west side of town are just peachy. Other days are a tad … dull. Depressing, even. Someone had enough time and energy to attack this Ginkgo tree in Plouffe Park: Meanwhile, over on Albert Street, where a half-assed multi-user path runs along the north side of the road, these have appeared scattered all along the path: Some of the posts are steel, like the one shown. Others are chunky 4×4 posts, all about 10′ high. I think the city buys one size of post, digs any depth hole, plants said post, then cuts it off at … Continue reading Dullsville

End of the Yellow Brick road, err buildings

The NCC wanted a different look and feel for the LeBreton neighborhood. They wanted a neighborhood that was distinctive. To this end they chose a particular palate of colours that all bidders had to employ. Predominate in this palate was yellow brick. It was always in the plan that as the buildings approached the south edge (I thought they meant Albert Street…) they would become two tone brick, employing the traditional red brick common to the older neighborhoods, to form a transition zone. I am not sure whether the lack of enthusiasm for the look of the recently constructed condos comes … Continue reading End of the Yellow Brick road, err buildings

Bike underpass progresses

The City is inserting a new bicycle underpass parallel to the O-Train track where it goes under the Somerset Street viaduct. A viaduct is like a bridge, except it isn’t hollow underneath, it has dirt fill between side retaining walls. In the picture below, the far side wall is visible as is the wall of the O-Train underpass  on the left edge of the picture.  A construction worker, busily supervised by another, is shown with a large horizontal saw blade (about 36″ diameter) riding on rail attached to the wall, cutting a horizontal opening through the wall. I suspect this is the … Continue reading Bike underpass progresses

Air rights over the transitway/LRT

Councilor Katherine Hobbs is in the news for asking the City to examine developing the air rights over the west side part of the transitway/LRT line. I have a bunch of mutually contradictory thoughts on this. 1. The City should sell air rights to help pay for the transitway. Taxpayers are forking out a bundle of money for a transit line, we can recoup some of that expenditure by selling prime access to the most-accessible locations in the city. Otherwise, many of the development benefits go to the builders on adjacent lands. In some cases, these are private developers; in the case … Continue reading Air rights over the transitway/LRT

My rules vs your rules

Yes, dealing with the City (and the BIA’s, the Community Associations, the Councilors, neighbours… you name it) can be frustrating. I persevere, joining traffic studies and public advisory committees because sometimes we “win”, ie speaking up effects a change or improvement in a project. But it can be terribly frustrating. The City is an impenetrable maze of rules and standards for any occasion. Too many times to count we are told “you can’t have that” because it violates some engineering code, or bylaw, or whatever. Only to turn around and see that violation employed somewhere else or to get the … Continue reading My rules vs your rules