Cyclopiste de Preston (vi)

Most of the photos in the previous posts on this cycling route showed the path in winter or early spring. That is not the most attractive time of year. Here are a few shots in summer, to show what a pleasant route the Cyclopiste de Preston could be for cyclists and pedestrians; for recreational, short-haul and commuter users; and for easy access to and from the Preston mainstreet. Continue reading Cyclopiste de Preston (vi)

Cyclopiste de Preston (ii)

 The first photo was taken mid-winter, from the area behind the City Centre warehouse complex; the Otrain track is on the right, going south under Somerset viaduct. This shows there is considerable open space on the east side of the track for a cycle path. A cycling and pedestrian underpass would be straight ahead centre in the photo. The underpass, a precast concrete “box”, would be a few feet above the current track level, and set back from the track far enough to allow for a LRT station on the far side (southside) of Somerset, should one be installed. There are … Continue reading Cyclopiste de Preston (ii)

Cyclopiste de Preston (ii)

 The first photo was taken mid-winter, from the area behind the City Centre warehouse complex; the Otrain track is on the right, going south under Somerset viaduct. This shows there is considerable open space on the east side of the track for a cycle path. A cycling and pedestrian underpass would be straight ahead centre in the photo. The underpass, a precast concrete “box”, would be a few feet above the current track level, and set back from the track far enough to allow for a LRT station on the far side (southside) of Somerset, should one be installed. There are … Continue reading Cyclopiste de Preston (ii)

Cyclopiste de Preston (i): Cycle Path along the Otrain Corridor

The Carling-Bayview community design plan calls for a bike path along the Otrain corridor. So does the City’s official cycling plan. Parts of the path were built in the early 1960’s when the NCC removed the street-level railway tracks and consolidated them into the new “cut” dug from Carleton U to Bayview, where the Otrain now runs, and the furture southwest LRT lines will run. The path has trees on both sides (moreso on the rail cut side) and a variety of views into back yards and small industries along the Preston side of the path. These walking and cycling … Continue reading Cyclopiste de Preston (i): Cycle Path along the Otrain Corridor

Cyclopiste de Preston (i): Cycle Path along the Otrain Corridor

The Carling-Bayview community design plan calls for a bike path along the Otrain corridor. So does the City’s official cycling plan. Parts of the path were built in the early 1960’s when the NCC removed the street-level railway tracks and consolidated them into the new “cut” dug from Carleton U to Bayview, where the Otrain now runs, and the furture southwest LRT lines will run. The path has trees on both sides (moreso on the rail cut side) and a variety of views into back yards and small industries along the Preston side of the path. These walking and cycling … Continue reading Cyclopiste de Preston (i): Cycle Path along the Otrain Corridor

Hickory-Champagne Condo Site

Mastercraft-Starwood acquired the Aquerello site on Champagne Avenue at Hickory some months ago. This site is immediately north of the Arnon proposed office towers at 853 Carling, and immediately south of the current and soon to be redeveloped humane society site. The new condos will border the OTrain on the east side of their site. Their proposal is for high condo buildings positioned to view Dow’s Lake. Recall that Hickory Street is likely to be continued across the Otrain corridor cut as a pedestrian street, which will also improve access to the Otrain station there for all the new developments … Continue reading Hickory-Champagne Condo Site

Bayview-Carling CDP Re-Activated !

Along the OTrain corridor is this hidden gem. After a long struggle by residents and the neighborhood associations (the Dalhousie Community Association and the Hintonburg Community Association), and with much behind-the-scenes pushing by the concerned Councillors Holmes and Leadman, the Bayview-Carling Community Design Plan has been reactivated by the city. The focus of the plan is Bayview Station to Carling Avenue, along the OTrain track, which is currently the subject of a development frenzy by condo and office developers who feel the time is right for the rebirth of this former industrial zone. No doubt some of the “time is … Continue reading Bayview-Carling CDP Re-Activated !

Condo mania on OTrain corridor

The issue of Ottawa Business Journal (OBJ) out this past week has a major story on the development pressures along the Carling-Bayview OTrain corridor, parallel to Preston’s trendy Little Italy. They interviewed me (tiny bit, amongst more illustrious others) following my postings about developments at the Champagne/Hickory/Carling area. You can read their story at http://www.ottawabusinessjournal.com/295971895949675.php Last week I attended the Civic Hospital Neighborhood Assoc meeting. First item was the new development by Domicile at the corner of Hickory and Champagne Avenue (shown below). The site is now a one storey industrial building, and is zoned for 4 storey redevelopment. A month or so ago, … Continue reading Condo mania on OTrain corridor

Underutilitzed lot on Champagne

Half way along Champagne Avenue is this drastically underutilized lot behind a 1960’s-era apt building. The lot is used for surface parking, and is not a desirable long-term use of valuable urban land. Given that it has street frontage along Champagne, I expect someday the owners will apply to relocate the parking underground and build condos — either apartment condos or townhouse condos — along the street. Depending on the condition of the existing apartments, they may even demolish the building and start anew. Continue reading Underutilitzed lot on Champagne

Out with the old, in with the condos

The printing establishment currently located at the corner of Hickory Street and Champagne Avenue is the only remaining industrial use in this section of the Bayview-Champagne corridor. It once was an industrial heartland of the city, with convenient rail access (the tracks were relocated into the cut in 1963, before that they ran at street level). The old Sunoco fuel depot site has been cleaned up and is currently zoned for a 40,000 sq ft building. The former Campbell Iron and Steel plant at the corner of Carling/Champagne (now a satellite parking lot for the Civic Hospital) is in process to become … Continue reading Out with the old, in with the condos

East Side of Champagne Avenue

The park at the corner of Beech and Champagne. It has bocce courts, playing fields (shown with ice-rink boards just delivered), a bicycle-polo park, and on the far side a play structure. The line of trees in the background is along the OTrain cut. Most of these trees will be lost when the cut is widened for the second phase of LRT construction, should the SW LRT service actually get built. This park could easily be expanded to the east by covering the cut with concrete girders and a playing field. The area on the other side of the cut … Continue reading East Side of Champagne Avenue

Champagne Ave condo site on the market

The Acquerello condo was in pre-sales several years ago but did not sell enough units to go ahead with construction. It was located at  the corner of Hickory Street and Champagne Avenue, one block south of the Carling Avenue O-Train station. The proposed building was quite large and offered nice layouts with views of Dows Lake and the downtown plus easy access to rapid transit. The lot is now back on the market. Domicile has proved there is a market for condos at this location, with his first tower at “Merion Square” built, and another two condo towers nearing construction. … Continue reading Champagne Ave condo site on the market

855 Carling, part ii

The Ottawa Civic Hospital Community Assoc. held a meeting on Tuesday evening. On the agenda was the 855 Carling Ave project proposed by Arnon Developments. They already own the two red brick office towers on Carling between Preston and Rochester (a site I vaguely recall might already have planning approval for a third tower?) – From their planning documents I had concluded in my post a few days ago that this was a rezoning well in advance of any project, but at the meeting it became clear that this project might proceed in the near future, and my interpretation was … Continue reading 855 Carling, part ii

855 Carling Avenue

855 Carling is a parking lot bounded by the OTrain Carling Station, Champagne Avenue S, and Carling Avenue. Immediately west of the site is the CMPA office buildings and beyond that is the Merion Square townhouse and two apartment towers being built by Domicile. The site is currently used as a park and ride lot for the Civic Hospital. The lot is owned by Arnon Developments, which tore down Campbell Steel and related industrial works on the site a number of years ago. The photo above is taken from Carling Ave near the Otrain Station, looking northwest. – The planning … Continue reading 855 Carling Avenue

LRT Maintenance Facility Site

There will be a low-key public meeting at City Hall on Wedn. June 24 from 5.30 to 8pm on the proposed new maintenace facility. No speaches, just poster boards and comment sheets. Recall that on May 27 Council approved the alignment (route) and station locations. The consultants and staff are now working on station design, the BRT to LRT conversion process, construction staging, and how the LRT and BRT will operate once the line opens. Their results will be shown at another open house in Sept. But back to the Maintenance Facility. Planners examined all the site along or near … Continue reading LRT Maintenance Facility Site

Urban Planning Nostalgia

Over at the blog The Ottawa Project is a story of visiting Lorne Ave and the not-unreasonable assumption that what is visible on Lorne represents that which was demolished on the Flats in the early 1960’s. I think that overview is overly sympathetic to the demolished areas. I do not wish to take the view that it was right to demolish whole neighborhoods/built up areas in favor of total rebuilding, which was the big government view of urban renewal then (note to today’s amateur city rebuilders and commentators who too often wish for bigger govt action – be careful of … Continue reading Urban Planning Nostalgia

Somerset Viaduct (Bridge) over the OTrain Line

Somerset west of Preston rises up and over the OTrain Tracks, near the City Centre Building. At the height of the crest, the bridge itself is only about 20′ long; the rest of the road is simply a fill between retaining walls. The road was designed long ago and the angle of the slope means that motorists cannot see what’s on the road (for eg, a parked car) over the crest. This creates a stopping-in-time problem. The solution selected by the City is to narrow the road to two lanes for vehicle traffic. The road is wide enough for a … Continue reading Somerset Viaduct (Bridge) over the OTrain Line

A stadium for Ottawa

Lansdowne Live? Scotiabank Place? LeBreton – Bayview? I am not a fan of a new stadium at Lansdowne Park. It is not accessible enough – the neighborhood streets are narrow, local-style shopping and residential streets. It is not on the Qway nor the transitway. Open air concerts and mass public events are just not compatible enough with the residential area. A major park, including residential development (yes, expensive condos) to help pay for it all, is better. A massive city expenditure on a fancy park just for the Glebe, no. I suggest we continue the urban fabric along Bank Street … Continue reading A stadium for Ottawa

Sir John Carling Bldg – demolish vs conversion

The Sir John Carling building is a large gray office slab rising out of the eastern edge of the Experimental Farm between Dows Lake / Prince of Wales Drive and Carling Avenue. Built in 1967, it is certainly a more-attractive building than many government cubicle farms. The distinctive brise soleil screens on the exterior (only on the west and south sides, the picture shows the east side without sun screens) were inspired by the trendy architecture of Brasilia, and promoted by the then minister of agriculture (Hees??), if my ageing memory serves me right. The Feds plan to demolish the … Continue reading Sir John Carling Bldg – demolish vs conversion